- adding a new job
- cloning a job
- adding labels to jobs
- editing job settings
- exporting a job
- importing a job
- moving a job between workspaces
- enabling and disabling the job scheduler
- starting and stopping jobs
- re-syncing job task execution
Viewing Your Jobs
To access the Jobs page, click the Jobs icon in the left navigation pane in the CData Sync interface. You can view a list of all your jobs from this page. The Jobs page has two tabs (Overview and History) that provide all the details about your jobs. The following sections explain the information on each of these tabs.Overview Tab
The table on this tab summarizes your jobs and enables you to manage them from one access point.
- Name: Lists the name of the job, the source and destination connectors, and the job type.
-
Label: Displays labels that you assign to your job. You add labels in either of these ways:
- Select … > Add Labels at the end of the job row.
- Click Add Labels in the Labels section on the Overview tab in the job settings.
- Schedule: Specifies the run schedule for your job. For more details, see Enabling and Disabling the Scheduler.
-
Last Run: Specifies the job run status, the last date and time that the job ran, how long the job took to run, and the number of rows that were affected. Job-run status values are as follows:
- Successful: Every task in the job completed successfully. The detail shows the number of tasks that completed and the total number of records that were affected (for example, 5 of 5 tasks completed. Total records affected: 100.).
- Partially Successful: At least one task moved data and at least one task did not fully succeed. The detail includes a task breakdown from the job run (for example, 3 of 5 tasks completed. 1 task partially replicated and 1 task failed. Total records affected: 80.).
- Failed: All tasks failed and no data was moved anywhere in the job. The detail shows the total number of tasks that failed (for example, 0 of 5 tasks completed. All tasks failed.).
- Error: The job did not run because of a connection or system-level failure.
- In Progress: The job is currently running. The detail shows live task progress (for example, 130 of 2000 tasks complete; 12 running; 8 queued).
- Next Run: Specifies the next date and time that the job will run.
- Choose your filter options.
-
Select Saved Filters > Add Saved Filter.
This selection opens the Add Saved Filter dialog.
- Enter a name for your filter. Then, click Add Saved Filter to save the filter and exit the dialog.

History Tab
The History tab displays history information about jobs that you have run. The table on this page contains the following columns with details about your jobs:- Run Date: Specifies the date that your job ran.
- Name: Lists the name of the job, the source and destination connectors, and the job type.
- Status: Specifes the status of the run.
- Records Affected: Specifies the number of rows that were affected in the run.
- Runtime: Specifies the amount of time that the job ran.
- Instance Id: Specifies the instance identifier (Id) that ran the job. This Id is important for clustered environments because it indicates which machine executed the job.
- You can organize your job history list in ascending or descending order for the Run Date or Instance Id columns. To order the columns, simply click the up (↑) and down (↓) arrows next to the column by which you want to sort.
- You can filter the history table by job type, status, source connection, and destination connection. Unlike other tabs, the History tab does not allow you to reset or save filter options. The only way you can clear a filter and return to the full table of jobs is to click the Jobs icon in the navigation bar.
- You can export the job history to your local machine by clicking the Export History button (upper right of the window). You can choose to export a history over 1, 2, or 5 days.
-
You can edit settings for a job, download the history log, or obtain details by clicking the options menu (…) at the end of a job row and selecting the option that you want.

Adding a New Job
This section explains how to configure and add a replication job, including how to manage destination schemas when you replicate from sources that support multiple schemas.Configuring a New Job
Adding a job requires preconfigured source and destination connections. After you define a source connection to your data source and a destination connection to your database, follow these steps to create a new job:- Click Jobs in the navigation bar to open the Jobs page.
- Click Add Job > Add New Job. This action opens the Add Job dialog where you can enter job information.
-
Enter a job name and select the source and destination connections.

- Select a job type.
-
Select a destination schema (if your destination supports schemas).
If the destination does not support schemas, the Destination Schema field is not displayed. For more details about destination schemas, see Configuring Destination Schemas.
- Click Add Job to create your new job and exit the dialog.
Configuring Destination Schemas
When a job runs, Sync automatically creates any required destination schemas.The destination connection must have the CREATE SCHEMA permission for Sync to create schemas automatically.
- Preserve source schema: Sync replicates each source schema into a matching schema in the destination, preserving the source structure.
-
Consolidate into a single schema: All tables from all source schemas are replicated into a single destination schema.
When you select this option, a Destination Schema field appears, as shown below. Select an existing schema from the list.
Click the Destination Schema field to select or search for an existing schema, or enter the name of a new schema. If the specified schema does not already exist, Sync creates it automatically when the job runs.

If the source does not support schemas, the Schema Strategy option is not displayed, and you select a destination schema as usual.
Cloning a Job
Instead of adding an entirely new job, you can clone an existing job. Cloning a job creates a new job by copying the settings and tasks from the existing job. Follow these steps to clone a job.-
Locate the job that you want to clone and select Clone from the options menu (…). This option opens the Clone Job dialog, where you can define what you want to clone.
-
Enter a name for your new job.

-
(Optional) Select the workspace in which you want to clone the job. By default, Sync creates the cloned job in the current workspace. If you want to clone it elsewhere, select Clone in a different workspace. When you choose this option:
- The dialog displays a New Workspace drop-down list from which you can select another workspace.
- When you select Clone in a different workspace, Sync automatically selects Choose a different Source and Destination, by default. You also must select the source and destination again. You can select the original source and destination or you can choose new ones.
-
(Optional) Select the Choose a different Source and Destination option if you just want to change the current source or destination.
For a cloned job, the new source connection must be of the same connection type as that of the original job. For example, if the original job uses a Salesforce source connection, the new job must also use a Salesforce source connection. However, you can select a different destination connection.
-
Select any of the following optional settings that you want to use.
Tasks: Copies all tasks from the original job. Events: Copies all events from the original job. Additional Settings: Copies alert, logging, and advanced settings from the original job.If you use a different source connection, you must verify that all the tables you add as tasks exist in your source before you run the job.
-
Enter a name for your new job.
- Click Clone to create your cloned job and display it in the job table on the Jobs page.
Adding Labels to Jobs
Sync enables you to add labels to jobs, which can be useful for organization and tracking. Labels can be anything that you want, for example, the job priority level (for example,High Priority, Medium Priority, or Low Priority). To add a label:- Click the Overview tab on the Jobs page.
- Select … > Add Labels from the end of the row for the job for which you want to add a label. This selection opens the JobName - Add Label dialog.
-
In the Search or Add Label text box, enter the label that you want to add. Then click Add.
The new text is added as the first label (Label), as shown below:
Repeat this step if you want to include additional labels.
- Click Save and your label is added to the Label column in the job row on the Overview tab.
Editing Job Settings
After you create a job, you might want to edit the settings and configuration options. For details about editing these settings and configurations, see Jobs.Exporting a Job
You can export a job from the Jobs page to a location on your machine. To export a job:- Open the Jobs page and click the Overview tab.
-
Select … > Export at the end of the job row in the jobs table. This selection opens the Export Job dialog.
By default, the job name is included in the File Name text box and the Enable option Export sensitive values is not selected. Application settings are exported as a SYNCJOB file (for example, MySettings.syncjob). If you enable the exporting of sensitive values, a Password text box is displayed. You must enter a password, which is used to export and encrypt sensitive values. You also need this password if you import the job at a later time.
- Click Export to download your job. Sync exports the transformation to your Downloads folder. From there, you can move it to any other location on your machine. The resulting SYNCJOB file contains the details of the exported transformation, including the destination, tasks, and additional settings.
Importing a Job
Sync enables you to import a job from your machine to the Jobs list. To import a job:- Select Add Job > Import Job from the Jobs page. This action opens the Import Job dialog.
-
Click Choose File to open an explorer window where you can select the job that you want to import. (The job file must be a SYNCJOB file, as shown below.) Then, click Import to expand the dialog.

- Keep the original job name or modify it, as necessary. Then, choose whether to create a new source and destination or to select an existing source and destination.
-
Click Import to import the job into the Jobs list.

Moving a Job between Workspaces
In Sync, a job can exist only in one workspace at a time. However, you can easily move a job from one workspace to another workspace, as follows:- Click the Overview tab on the Jobs page.
-
Select … > Move from the end of the row for the job that you want to move. This selection opens the Move Job dialog, which displays the originating workspace.

- Select the destination workspace from the New Workspace list.
- Click Move to transport your job to the new workspace.
Enabling and Disabling the Scheduler
You can enable or disable the schedule via the following methods:-
The Schedule column on the main Jobs page. You enable or disable the scheduler for all jobs by toggling the schedule toggle in the Schedule column.

-
The toggle in the Schedule column of a specific job row.

-
The master toggle in the Schedule category on the Overview tab of an individual job (enables or disables all schedule rules for that job at once).

-
The toggle on an individual schedule rule (enables or disables that specific rule without affecting other rules for the job).

Starting and Stopping Jobs
You can start a job by positioning your cursor over the entry for the job and clicking the Run Job (▷) icon. When a job is running, you cancel that run by clicking the Stop Job Run (■) icon.Re-Syncing Job Task Execution
Sync provides a Re-Sync Tasks option that enables you to rerun all tasks in a job or selected tasks from a defined starting point without modifying advanced job settings. This feature simplifies the process of reloading data. Previously, resetting a table required manually enabling options such as Drop Table or Truncate Table Data on the job’s Advanced tab, running the job, and then restoring the original settings. The Re-Sync Tasks option consolidates this workflow into a single action. Re-Sync Tasks options override any replication options that are configured at the job or task level for that run only. After you initiate a resynchronization (re-sync), the selected tasks are queued and executed through the standard job execution flow.Accessing the Re-Sync Tasks Option
The Re-Sync Tasks option is available in the Sync UI at multiple levels, depending on the scope of the operation. You can access the option in the following locations:- Job level: On the Overview tab of the Jobs summary page, you can re-synchronize all tasks in a job by selecting Re-Sync Tasks from the …Options menu (upper right of the window).
- Task level: On the Tasks tab for a job, you can re-sync an individual task by selecting the task and then selecting Re-Sync Tasks from the …Options menu (upper right of the window) for an individual task to re-sync a single table.
- Bulk edit bar: On the Tasks tab, the bulk edit bar appears when you select one or more tasks. Clicking Re-Sync Tasks on the edit bar applies that operation to all selected tasks.

Configuring Re-Sync Task Options
Click Re-Sync Tasks to open the Re-Sync Tasks dialog, where you can configure the following options:- Period: Specifies where you want the resynchronization to begin:
- (Default) From Beginning: Resynchronizes all data from the beginning and ignores any previous replication state.
- From Position: Starts resynchronization from a specified point that is defined by a date or a number. When you select this option, the dialog displays additional options:
- Start Value Type: Specifies the type of starting value. You can choose from the following types:
- Data-based: Requires a date in the Start Date field as the starting position.
- Number-based: Requires a numeric value that defines the minimum position from which you want the replication to begin. When you select this type, you must enter the minimum integer value for where you want to begin replication.
- Snapshot Interval: Specifies the number of rows by which data should be partitioned during retrieval.
- Start Value Type: Specifies the type of starting value. You can choose from the following types:
- From Now: Begins resynchronization from the current point in time.
- Write Mode: Specifies how existing data in the destination table is handled during resynchronization:
- (Default) MERGE: Merges incoming data with existing data in the destination table.
- TRUNCATE: Removes all rows from the destination table before resynchronization, but the table schema is maintained.
- DROP: Deletes the entire destination table and re-creates it before resynchronization.